May 17, 2005
Scott, Howard and Alan from ACI Concrete dug the footings and poured the cement for the deck and lower pier. It was a wonderful day weatherwise, with temps going from 51 F at 8:30am to 65 F by the time they finished around 11:30am. Howard is an amateur astronomer as well. He built an 8" reflector. While digging the holes, we discussed astronomy and equipment.
Breaking Ground on the telescope pier foundation
Still digging the hole for the telescope pier base
Nearly done with the hole for the telescope pier base
Finished hole for the telescope pier base
Elevated site view after all three holes are dug
Concrete truck arrives shortly after 11am
Loading concrete into the wheelbarrows
Pouring concrete into the lower pier foundation
Concrete poured and ready for the chimney block
Scott finishes off the deck post footings
Laying in the first chimney block for the lower pier
Checking the level and position of the first chimney block
Rebar added to the lower pier
Site view after concrete poured
Lower pier footing curing